iDIG delivered a package of works valued at around $2.2 million on the Pakenham Level Crossing Removal Project.  Main bulk earthworks and rock placement took place over a 12-week period. Our team delivered high-quality work on time and on budget.


Scope of works:

  • Excavation – cart and dispose of 10,000m3 of soil

  • Sub-grade preparation and soft spot rectification

  • Placement of over 11,500 tonnes of crushed rock and CTCR

  • Construction of 350m2 of covered walkways roofing structure

  • FRP of 700m2 of concrete walkways, footpaths and crossovers

  • Relocation of bus depot during occupation works (including site levelling, asphalt and concrete works)

PAKENHAM LEVEL CROSSING REMOVAL

iDIG delivered a package of works valued at around $2.2 million on the Pakenham Level Crossing Removal Project.

Sector

Rail

Client

John Holland

PAKENHAM LEVEL CROSSING REMOVAL